Fruta del Norte Project – Construction of Ramps and Associated Works

Client: Lundin Gold – Aurelian Ecuador SA
Location: Yantzatza, Ecuador

Development of 2 parallel ramps towards the mineralized body of the mine, construction of marine thrusts, drainage and ventilation galleries.

Description:

  • Horizontal Excavations 7.982m
  • Cover Drillings 2.700m
  • Probe Drillings 7.000m