Client: Gold Corp
Location: Santa Cruz, Argentina
Development of a ramp with a slope of 12%, development of galleries and chimneys, drilling stations, thrusts for electrical substations.
Description:
- Horizontal Excavations 9.474lm
- Vertical Excavations 547lm
- Reinforcement (Bolts) 44.012un
- Reinforcement (Mesh) 58.184m²
- Reinforcement (Shotcrete) 3.487m³