Cerro Negro Project

Client: Gold Corp
Location: Santa Cruz, Argentina

Development of a ramp with a slope of 12%, development of galleries and chimneys, drilling stations, thrusts for electrical substations.

Description:

  • Horizontal Excavations 9.474lm
  • Vertical Excavations 547lm
  • Reinforcement (Bolts) 44.012un
  • Reinforcement (Mesh) 58.184m²
  • Reinforcement (Shotcrete) 3.487m³