Los Bronces Tunnel Construction

Client: Angloamerican Chile
Location: Santiago, XIII Region, Chile

Strap Tunnel Excavation (4.000ml):

  • Reinforcement (Bolts) 26.742un
  • Reinforcement (Mesh) 9.558m²
  • Reinforcement (Shotcrete) 42.665m³
  • Steel Frames 283un